Package 2: 14.6 km railway, 12.6 km tunnel
Package 5: 9.6 km railway, 6.9 km tunnel
Two sections of 125 km long single track, broad gauge railway project. Total length of the two sections under our responsibility is 24 km and the design speed is 100 km/h.
There are 4 tunnels with a total length of 19.5 km, 3 bridges and 2 stations within the scope of the project.
The railway connection is expected to reduce the journey time between Rishikesh and Karanprayag from 7 hours to 2 hours. Longest tunnel within our scope is 6657 m.
Two sections of 125 km long single track, broad gauge railway project. Total length of the two sections under our responsibility is 24 km and the design speed is 100 km/h.
There are 4 tunnels with a total length of 19.5 km, 3 bridges and 2 stations within the scope of the project.
The railway connection is expected to reduce the journey time between Rishikesh and Karanprayag from 7 hours to 2 hours. Longest tunnel within our scope is 6657 m.