2 Sections
Total length 76.58 km
Ordu Ring Road:
The project comprises of a 21.4 km long road with 26 m platform width and 2x2 divided roads. It involves 6 double-tube tunnels, 10 viaducts, 3 bridges, 3 overpasses, 9 underpasses, 48 box culverts and 16 different piled walls. There is also a 3 level junction.
Ordu-Ulubey Junction-Topcam-Mesudiye Road:
1st Section
It is a 15.45 km long state road. There are 6 single tube tunnel structures with a total length of 2,274 m.
2nd Section
It consists of two parts of 20.18 km and 19.55 km. There are 4 single tube tunnels with a total length of 4,374 m.
Ordu Ring Road:
The project comprises of a 21.4 km long road with 26 m platform width and 2x2 divided roads. It involves 6 double-tube tunnels, 10 viaducts, 3 bridges, 3 overpasses, 9 underpasses, 48 box culverts and 16 different piled walls. There is also a 3 level junction.
Ordu-Ulubey Junction-Topcam-Mesudiye Road:
1st Section
It is a 15.45 km long state road. There are 6 single tube tunnel structures with a total length of 2,274 m.
2nd Section
It consists of two parts of 20.18 km and 19.55 km. There are 4 single tube tunnels with a total length of 4,374 m.