2015-2016, MOGLICE, ALBANIA

HPP Moglice Headrace Tunnel Project (Moglice Hydro-Electrical Power Plant Energy Transmission Tunnel)

Design of a 6.47 km long TBM tunnel as part of the 10.8 km long transmission tunnel planned under the Hydro-electrical power plan project.

Largest BOT investment in the hydro-electrical field in Albania

Overview
Project Summary

Design of a 6.47 km TBM tunnel

Services
Location
Moglice, Albania
Period
2015 - 2016
Employer/Client
Limak LAJV/Devoll Hydropower / Statkraft

Write down the word you are searching for and press "ENTER".
Press "ESC" to close.