MATEEN TUNNEL AND CONNECTION ROAD, IRAQ
In scope of the project, there is preparation of 15.55 m highway design and the project covers the bored tunnel opened with 4.76 km conventional method, 300 m viaduct, 10.5 m level line, excavation and filling. In addition, the service structures have been designed like business building, transformer, water storage and car lot unit.