BALIKESİR-DURSUNBEY-HARMANCIK-TAVSANLI HIGHWAY LANDSLIDES
Soil investigstions were carried out, and necessary measures were identified for solution of the stability problems.
Switch tunnel designed in scope of Ankara Metro, Gar – Adliye – Kizilay Connection Line Turnout Tunnel is approx 15.5 m wide and 13.0 m high. Subject tunnel is in Ankara Clay, and considering the sizes, planned to be bored at six stages with NATM principles. Tunnel is analyzed with 3D model.
Yakakent-Gerze Highway is located at the Eastern Black Sea Coastal Road, in the Samsun-Sinop section, starting at Yakakent subprovince and ending at Gerze subprovince. The fact that the route passes through a difficult geological region, and the need to establish an environmentally sensitive project at the region, which is known for its nature/sea attractions, constitute the important criteria of the project. Total length of the road which is realized pursuant to divided road standards is 36 km.