POWERPLANT PORT, ASH STORAGE AREA AND DEEP SEA DISCHARGE, TURKEY

In scope of the project; wind and wave climate studies (obtaining of wind data, wave forecasting studies, long-term wave statistics, maximum value of the wave statistics, wave transformation studies) and preparation of general settlements plan studies, determination of sections and stability calculations for 844 m coastal fortifications, preliminary and detailed designs of 522 m piled jetty to be served to bulk carrier with two 180,000 DWT capacity, lighting on the pier, water supply, studies on surface water drainage, cable and installation channel settlement plan and sections, simulation of the navigation studies, BOQ preparation, revision of the feasibility report which was prepared before and preparation of the technical specification studies have been completed.