LEVENT-HISARUSTU METRO

The tunnel electric and mechanic installation, line infrastructure projects, cut-and-cover stations’ architectural, reinforced concrete, electric and mechanic installation detailed designs and as-built projects of all disciplines belonging to 3.103 km main route, 0.59 km Levent connection line and 0.63 km Seyrantepe storage area have been prepared.