KESIKKOPRU DAM – IVEDIK PORTABLE WATER TREATMENT PLANT WATER TRANSMISSION LINE

To overcome the water lack experienced during the recent drought seasons in Ankara, with approx 5 million population, ASKI has decided to construct a new watertranmission ine from Kesikkopru Dam to Ankara in addition to current sources. Tranmission line consists of three parallel pipes each with a diameter of 1600 mm and with a length of 130 km (total 390 km). There are 10 depots and five pumping stations with a total capacity of 205.000 cum along the line.