ALGERIA TRAMWAYS

The work covers Setif, Mostaganem and Sidi Bel Abbes Tramways. Total length of these 3 Projects is 50,6 km, number of the stations are 61.
There are the final project based on detail design, preparation of tender documents, consultancy and supervision services under setif and Mostagenem Tramways and detail design works have been prepared for Sidi Bel Abbes Tramway.
The consultancy and supervision services are continuing for Mostaganem and Setif Tramway.