ANKARA CENTRAL WASTE WATER TREATMENT PLANT

Ankara Central Waste Water Treatment Plant is constructed to serve for an equivalent population of approximately 4 million with a capacity of 765.000 cum/ day in the 1st Phase.

“Classic activated sludge system with surface aeration” is adopted as the treatment process. Anaerobic sludge stabilization and mechanical sludge dewatering (decanter) are applied and an important saving is achieved in operation costs with power produced from biogas in anaerobic digesters.